A container held at Rotterdam or Osaka costs more per day than the inspection that would have prevented it. We build the technical file alongside production, and we keep the test evidence that customs and notified bodies ask for.
Eyewear regulation is not harmonised. The same frame needs different evidence depending on where it lands — and the requirements below are what we prepare by default.
| Market | Regulation | What we prepare | Test evidence |
|---|---|---|---|
| European Union | CE — EU 2016/425 (PPE, sunglasses) EN ISO 12870 (frames) |
Technical file, declaration of conformity, labelling artwork | Dimensional, mechanical strength, EN 1811 nickel release |
| United States | FDA 21 CFR 801.410 | Impact-resistance records, compliant labelling, importer documentation | Drop-ball test, 100% of production lots sampled |
| Japan | JIS S 7302 / JIS T 7333 | Per-shipment inspection sheet, dimensional record | Tolerance check against JIS limits, hinge durability |
| Korea | KC certification | Test coordination, registration support, Korean labelling | Third-party laboratory testing, coordinated by us |
Classification of optical frames as medical devices varies by member state. We will confirm the route for your specific product and destination in writing before tooling begins.
Every critical dimension measured against the 2D drawing on first article, then sampled at AQL 1.0.
10,000 open/close cycles on a pneumatic rig, with torque measured before and after.
FDA-specified 16 g steel ball from 1.27 m, on lenses and on finished eyewear.
EN 1811 screening on metal components, with third-party confirmation for EU shipments.
X-ray fluorescence on every plating batch; 3 µm minimum recorded per lot.
Spectrophotometer check against the approved master, ΔE ≤ 1.0 for production.
Our quality system is certified to ISO 9001. For clients whose frames are classified as medical devices in their market, we apply the documentation structure of ISO 13485 — design history file, risk analysis, traceability and CAPA — without claiming a certification we do not hold.
Every batch carries a material lot number, an operator record and an inspection report. If a claim arrives eighteen months later, we can trace the block it came from.
A written containment report: how many units are affected, where they are, and what we propose to do with them.
Root-cause analysis against the production record, and a corrective action with an owner and a date.
Replacement, credit or rework at our cost. We do not ask a client to absorb our mistake.
We will send a redacted example for a comparable product so your compliance team can review the structure before you commit.